Services

Kitchen Remodeling Bay Area

Modern, functional, and beautifully crafted kitchens across the Bay Area.

Intro

Feldman Construction provides high-quality kitchen remodeling in the Bay Area

for homeowners who want a kitchen that looks exceptional and functions better every day. We deliver a professional, organized process from planning through final walkthrough — so your remodel stays clear, clean, and well-executed.

Many homeowners start with the same goal: a Bay Area kitchen remodel that improves workflow, storage, and lighting without sacrificing design.

If you’re comparing options for a kitchen remodel in the Bay Area, we’ll help you define the right scope and build a plan for your home.

We serve homeowers across the Peninsula and South Bay, including Sunnyvale, Mountain View, Los Gatos, Los Altos, Cupertino, Saratoga, Santa Clara, San Jose, Campbell, Palo Alto, and surrounding Bay Area communities.

Planning Your Remodel

Professional Kitchen Remodeling

“Professional kitchen remodeling” means more than installing cabinets and countertops. It means managing the entire system — layout, trades, sequencing, permits when required, and finish-level execution — so your kitchen performs well for years.

Clear scope and planning so you know what’s included and what decisions are needed

Permit-aware sequencing for plumbing, electrical, ventilation, and inspections

Quality control across tile, cabinetry, countertops, flooring, paint, and finish carpentry

Job site protection to keep your home clean and organized during construction

Consistent communication so you always know what’s next

We also support related area remodeling work that often connects to the kitchens, including flooring transitions, paint, lighting upgrades, and adjacent spaces.

Planning Your Remodel

Bay Area Kitchen Remodeling Services

Our Bay Area kitchen remodeling services range from targeted upgrades to full renovations with layout changes. We design and build kitchens that improve daily life — better storage, better flow, better lighting, and a cohesive finished look.
Common kitchen remodel scopes include:

Full kitchen renovation

(demo + rebuild)

Layout improvements

(opening space, better circulation, island/peninsula design)

Cabinetry

(Stock, semi-custom, or custom storage solutions)

Countertops and backsplash

(Quartz/stone + tile design)

Lighting upgrades

(Recessed, pendants, under-cabinet, task lighting)

Electrical upgrades

(Appliance-ready planning, circuits, modern safety requirements)

Lighting upgrades

(Fixtures, filtration, relocation when needed)

Flooring

(Engineered wood, tile, premium surfaces)

Full kitchen renovation

(demo + rebuild)

Finish carpentry

+ paint for a complete look

If you’re not sure whether you need a “remodel” or a “renovation”, the difference typically comes down to complexity. A renovation often includes deeper systems work and larger layout changes. We’ll help you scope the right level based on your home and goals.

Recent Works

Recent Bay Area Kitchen Remodels

Bay Area homes vary widely, and great results come from planning around real constraints: older plumbing/electrical, ventilation needs, structural walls, and selection lead times. Below are examples of the type of work we deliver:

Cost

Kitchen Remodel Cost in the Bay Area

Kitchen remodel costs vary based on layout changes, cabinetry level, appliances, and the complexity of plumbing/electrical work. In the Bay Area, many kitchen remodels fall between $30,000-$80,000, while high-end projects often exceed $100,000+, depending on scope and finish level.

If you’re researching kitchen remodeling cost San Jose, pricing is typically influenced by cabinetry level, appliance packages, layout changes, and the amount of electrical/plumbing work required.

Key cost drivers include:

Cabinetry

Stock vs. semi-custom vs. full custom

Layout Changes

Moving walls, engineering, reconfiguration

Electrical & Plumbing

Circuits, panel capacity, fixture/appliance relocation

Appliances

Standard vs. built-in / chef-grade packages

Finish Complexity

Countertop material, backsplash patterns, flooring transitions

The Remodeling Process

How Long Does a Kitchen Remodel Take

Most Bay Area kitchen remodels take 6-12 weeks for constructions once selections are finalized and permits/material lead times are coordinated. Timelines vary if you’re changing layout, ordering custom cabinetry, or coordinating multiple inspections.

1

Layout, cabinets, counters, appliances, and lighting.

Planning and selections

2

If required.

Permit

3

Demo → rough/plumbing/electrical → cabinets → counters → finishes

Construction

4

Punch list and final walkthrough

Final Walkthrough
Getting Started

Permits and Code Considerations in the Bay Area

Many kitchen remodels require permits—especially if you change plumbing locations, upgrade electrical, modify ventilation, or perform structural work. Requirements vary by city and scope.

We plan your remodel with compliance and sequencing in mind so inspections (when required) support progress—not delay it.

The Remodeling Process

Our Kitchen Remodeling Process

A successful remodel is less about “hoping it goes smoothly” and more about running a consistent process.

Step 01

Consultation + scope alignment

Goals, priorities, budget range, timeline, feasibility

Step 02

Layout + design direction

Workflow, storage plan, appliance strategy, lighting, approach

Step 03

Selections + pre-construction planning

Materials, ordering, scheduling, coordination

Step 04

Permits + inspections (when required)

city-specific pathway based on scope

Step 05

Build + quality control

Trade coordination, finish execution, detail checks

Step 06

Final walkthrough + closeout

Punch list completion and handoff

Locations

Service Areas

Feldman Construction serves homeowners across the Bay Area, including: Campbell, Cupertino, Los Altos, Los Gatos, Mountain View, Palo Alto, San Jose, Santa Clara, Saratoga, Sunnyvale, and nearby cities. If you don’t see your city listed, request a consultation and we’ll confirm coverage.

Testimonial

Bringing Your Vision to Life

Tania Bouchet
Great experience! I managed project from another state and the continual communication and updates were perfect. Project got done early and work was perfect. Professional crew showed up on time and stayed to schedule. Such a great job we are using them for another project in Capitola. Highly recommend!
Christine L
Ginadi (Feldman) did an AWESOME job managing the renovation of our house built in the 70’s to being our forever home. We chose him for his integrity, his transparency, and just him being a pleasure to work with from beginning of our project (proposal/quote) to completion of our beautiful house. There were no “surprise” charges in what was quoted to us. He gave us practical advice on choosing alternate materials. He followed our architect’s design to the “T”. And more importantly, we worked with him as a team, which enabled us to move-in to our brand new house as planned. If you have a construction project, look no more. You will not be disappointed hiring Feldman Construction.
Rodney L
I can't say enough great things about Ginadi Feldman with Feldman Construction. When first looking for a contractor to take on our entire house remodel, Ginadi and his team seemed to be the company that we could trust with such a project. It was such a joy to work with Ginadi, who communicated with us every step of the way and was extremely easy to work with. You will have no problems getting in contact with him with any questions or concerns. In fact even after the project was finished, we still can rely on Ginadi to answer our calls. His company has heart, he truly cares about his clients, and it is evident through every single interaction.
FAQ

Q&A: Kitchen Remodeling Bay Area

Yes, Most kitchen remodels involving plumbing, electrical, or structural changes require a permit. Requirements vary by city, so it’s important to check with your local building department or consult a licensed general contractor.
Contact us to learn more about permits

In the Bay Area, a typical kitchen remodel ranges between $30,000 and $80,000. High-end kitchen renovations with custom cabinetry, premium materials, and layout changes can exceed $100,000. Costs depend on the size, scope, and level of finish.

Most kitchen remodeling projects take 6 to 12 weeks to complete. This timeline includes demolition, structural work, plumbing and electrical upgrades, cabinet and appliance installation, and final inspections. Delays may occur based on permitting, material lead times, or custom requests.

The first step is planning and design, followed by securing permits. Construction begins with demolition, then rough plumbing and electrical work. Cabinetry, countertops, flooring, and finishes are installed after that.

To save money, consider keeping the existing layout, refinishing instead of replacing cabinets, and choosing mid-range appliances and materials. Working with a design-build
firm can also help streamline the process and prevent costly mistakes.

In most cases, kitchen remodels are not tax deductible unless they are medically necessary or part of a qualified home office renovation. Always consult a tax professional to understand your specific situation.

A well executed kitchen renovation can increase a home’s value by 5 to 15 percent, especially in competitive real estate markets like Palo Alto, Menlo Park, and San Mateo. Updated kitchens are a top selling point for buyers.

Homeowners often use home equity loans, lines of credit (HELOC), personal loans, or renovation-specific financing programs. A qualified contractor can help connect you with trusted lenders.

Clear out your kitchen space, protect surrounding areas, and set up a temporary kitchen if needed. Communicate with your contractor about the project schedule and make
material selections in advance to avoid delays.

Ready to Start Your Bay Area Kitchen Remodel?

If you want a kitchen that’s built for daily life and finished with real craftmanship, request a consultation today. Include your city, your preferred style, and whether you’re planning layout changes, plumbing/electrical updates, or an appliance upgrade, and we’ll advise on the best next step.